The Construction Phases
What actually happens on site, in order, and what to check at each stage before it is covered up. Concrete and plaster hide everything. Once a stage is buried, your only options are trust or demolition.
Your architect should inspect and certify each stage before you release payment — see Choosing a Contractor.
Before Work Starts
1. Site Setting Out and Excavation
The building is marked out on the ground and foundation trenches are dug.
Check before proceeding:
2. Foundation
Footings, reinforcement, and concrete.
Check before the concrete pour — this is your last chance:
3. Columns, Ground Beams, and Backfilling
Check:
4. Walls / Blockwork
Check:
5. Roof Slab Casting
The biggest single pour of the project, and a milestone with real consequences — the roof slab grant in Government Schemes, Refunds and Grants relates to this stage.
Check before the pour:
⚠️ Do not let props be removed early to speed the next stage. The concrete has not reached strength.
6. Plumbing and Electrical Rough-In
Pipes and conduits are chased into walls and slabs before plastering.
Check before plastering closes it all in:
7. Plaster, Screed, and Waterproofing
8. Finishes
Tiles, doors, windows, joinery, sanitary ware, painting, kitchen.
9. Externals
Frequently excluded from the main contract — confirm with your contractor.
10. Snagging and Handover
Before the final payment, walk the house with your architect and write a snag list.
Then proceed to After Completion.
⚠️ Important Note
🚨 The single most valuable habit on site: photograph every stage before it is covered. Reinforcement before concrete, conduits before plaster, foundations before backfill. It costs nothing, and it is the only evidence you will ever have.